Slovenia’s longest railway tunnel broken through
https://www.railwaygazette.com/infrastructure/slovenias-longest-railway-tunnel-broken-through/66636.article
Travel time between Divaca and the port of Koper is 39 minutes by the fastest train or 61 minutes by the slowest train.
I don't know how much time will be saved by this tunnel opening. But, I'd like to celebrate this opening.