Keisei Electric Railway installs 3200 series train. It's slated to run from winter in 2025
https://tetsudo-ch.com/12960928.html
(Summary of the article starts)
On May 20, Keisei Electric Railway announced installation of 3200 series train.
It initially consists of 6 cars. But, it's adjustable by coupling or uncoupling 2 car units, depending on demand.
Exterior of the train succeeds the current Kesei color.
Wheel chair space or Free space is ensured on each car. Straps on the new train will be lower than current ones to allow younger passengers grab the ones.
3 surveillance cameras will be installed on each car.
Commercial running will be in winter 2025.
(Summary ends)
Is there possibility to let the train run as 2 car train?