First section of Honolulu metro handed over ready for opening
https://www.railwaygazette.com/metros/first-section-of-honolulu-metro-handed-over-ready-for-opening/64298.article
In January, I watch the train running as a
test. I guess the frequency was the same as or half of the actual operation. So, I guess the opening date won't be postponed.
I am looking forward to seeing the first urban railway in Hawaii.