Upgrade to handle growth in Asia – Europe rail freight
http://www.railwaygazette.com/news/freight/single-view/view/upgrade-to-handle-growth-in-asia-europe-rail-freight.html
Time consuming thing on Euro-Asia rail transportation is gauge-changing systems. Trains running between China and Europe have to change bogies from ones for 1435mm to those for 1520mm just before entering Russia or CIS nations.
I wish there would be Free Gauge Locomotives and Free Gauge freight cars to skip such a troublesome procedures.